No Project Name / Brief Description
0912 Erbil Refinery OSBL Facilities Pipelines - IRAQ
Piping Systems Between Erbil Refinery and Tank Farm Detailed Engineering
KAR Construction and Engineering (2009 - 2010)
0911 Nasiriya Oil Field Development - IRAQ
2 Billion Barrels Reserv Capacity Oil Field Development Front End Engineering Design (FEED)
Weatherford MENA (2009)
0909 Dogancay Railway Fuel Pipeline Variant
For 6 inch Pipeline (90 bar), 418 m Variant Construction, 30 m Railway Crossing with 10 inch Casing, Hydrostatic Test and Cathodic Protection System Detailed Engineering
Elen Energy Inc. (2009)
0908 Marmara Ereglisi Fuel Terminal
250,000 cum Tank Farm and Sea Terminal Detailed Engineering
Marmara Depoculuk Hizmetleri Inc. (2009 - 2010)
0904 Istanbul Kurtkoy TEM Junction Fuel Pipeline Variant
For 6 inch NATO Pipeline 285 m Variant Construction and Cathodic Protection System Detailed Engineering
Orhan Evin - Kucukel Joint Venture (2009)
0901 Bogacay River Fuel Pipeline Variant
For 8 inch Pipeline (90 bar), 612 m Variant Construction, at 2 Location Total 30 m Road Crossing with 12 inch Casing, Hydrostatic Tests and Cathodic Protection System Detailed Engineering
Ministry of Defense (2009)
0818 Erbil Integrated Project Khurmala - IRAQ
40 km 20 inch and 11 km 6 inch Crude Oil Pipelines and Manifold Stations Detailed Engineering
Kar Construction and Engineering (2008 - 2009)
0817 TaqTaq Oil Field Crude Oil Trunk and Flow Lines - IRAQ
15 km Crude Oil Pipelines Detailed Enginering
Zozik - Gorkem Joint Venture (2008 - 2009)
0816 Adapazari Mekece Fuel Pipeline Variants
1,870 m Variant Construction, Hydrostatic Tests and Cathodic Protection System at 8 Location for 6 inch Pipeline (90 bar) on Ankara-Istanbul High Speed Train Railway Route at Adapazari Mekece Region Detailed Engineering
Firat Construction Ltd. (2008)
0808 TaqTaq Oil Field Crude Oil Flow Lines - IRAQ
3300 m, 6 inch Crude Oil Flow Lines and Manifold Connection Detailed Enginering
Zozik - Görkem Joint Venture (2008)
0804 Izmit, Uskudar; Bandirma Fuel Storage Tanks Restoration
Renewal of Tank Bottom Steel Plates and Epoxy Coating of the 4 each 1250 cum and 2500 cum Storage Tanks Detailed Engineering and Construction Supervision
Ministry of Defense (2008)
0717 2005 Fuel Pipelines Variants
For 4,6,8 and 10 inch NATO Pipelines, at 12 Location Total 4025 m Pipeline Variant, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (2007 - 2008)
0716 Dalaman Airport Fuel Terminal Upgrade
5000 cum Jet Fuel Storage Tank and Connections Detailed Engineering
Petrol Ofisi Inc. (2007)
0713 Derince Fuel Terminal Manifold Rehabilitation
White Product Pump and Manifold Station Renewal Detailed Engineering
Petrol Ofisi Inc. (2007)
0711 Istanbul Samandira Fuel Pipeline Variant
For 6 inch Pipeline (90 bar), 1011 m Variant Construction, 26 m Road Crossing with 10 inch Casing, Hydrostatic Test and Cathodic Protection System Detailed Engineering
Bayraktar Kardesler Construction Inc. (2007)
0710 Iskenderun Dortyol Fuel Pipeline Variant
For 8 inch Pipeline (90 bar), 1188 m Variant Construction, 36 m Road Crossing with 12 inch Casing, Hydrostatic Test and Cathodic Protection System Detailed Engineering
Atakas Inc. (2007)
0709 Istanbul Samandira Fuel Pipeline Variant
For 6 inch Pipeline (90 bar), 427 m Variant Construction, Hydrostatic Test and Cathodic Protection System Detailed Engineering
Ismail Oncel (2007)
0707 Malatya Beylerderesi Fuel Pipeline Variant
For 6 inch Pipeline (90 bar), 5 m Road Crossing with 10 inch Casing, 202 m Variant Construction, Hydrostatic Tests and Cathodic Protection System Detailed Engineering
State Highways 8th District Directorate (2007)
0706 Afyon Sandikli State Highway Fuel Pipeline Variants
For 8 inch Pipeline (90 bar), at 4 Location 245 m Road Crossing with 12 inch Casing, at 2 Location 595 m Variant Construction, Hydrostatic Tests and Cathodic Protection System Detailed Engineering
Simsekler İnşaat Ltd. (2007)
0704 Konya Main Airforce Base Fuel Pipeline
5560 m, 6 inch Pipeline, Cathodic Protection System, Valve Pit and Fuel Transfer Pumps Detailed Engineering and Construction Supervision
Ministry of Defense (2006 - 2007)
0701 Istanbul Europe Side Fuel Pipeline Displacement
6 inch 80 m Pipeline (90 bar) Displacement, 22 m Crossing with 10 inch Casing and Cathodic Protection System Detailed Engineering
MVM Turizm ve Ticaret Ltd. (2007)
0622 South Antalya Tank Farm Restoration of Storage Tanks
Renewal of Insulations and Epoxy Painting of the 10000 cum and 5000 cum Storage Tanks Detailed Engineering and Construction Supervision
Ministry of Defense (2006 - 2007)
0619 Mersin Fuel Pier F-76 Pipeline Connection
1600 m, 8 inch F-76 Pipeline From Mersin Tank Farm to Fuel Pier, 10 cum Drainage Tank, 3 each Valve Pit and Cathodic Protection System Detailed Engineering
Ministry of Defense (2006)
0616 Khurmala Oil Field Manifold Stations - IRAQ
Khurmala Oil Field South, Middle and North Areas Choke Valve and ESD Manifold Stations Piping, Structural and Instrumentation Detailed Engineering
Kar - Avrasya Oil & Gas Services JV (2006)
0608 Antalya - Cukurhisar Pipeline Damages and Fuel Facilities Restoration
8 inch, 530 m Pipeline (90 bar) Renewal, 105 m River Crossing, 40 m Gabion, 1500 m Pipe Insulation and 6200 sqm Roof Restoration at 12 Stations Detailed Engineering and Construction Supervision
Ministry of Defense (2006)
0607 West Turkey Fuel Facilities Restoration
6 each 10 cum Drainage Tank, 8500 sqm Roof Restoration at 20 Station, 380 m Perimeter Fence, Concrete Pavement, Hydrostatic Test and Cathodic Protection System Detailed Engineering and Construction Supervision
Ministry of Defense (2006 - 2008)
0606 Elazig - Mus Pipeline Damages and Fuel Facilities Restoration
6 inch, 3,325 m Variant Construction (90 bar), 86 m River Crossing, Hydrostatic Test and Cathodic Protection System, 7,500 sqm Paved Areas and Internal Roads Restoration at 3 Stations Detailed Engineering and Construction Supervision ,
Ministry of Defense (2006 - 2007)
0605 Malatya - Batman Pipeline Damages and Fuel Facilities Restoration
4 and 6 inch, 790 m Pipeline (90 bar) Renewal, 70 m River Crossing, 120 m Gabion, 2300 m Pipe Insulation, 3600 m Wire Fence at 5 Stations and 4300 sqm Roof Restoration at 11 Stations Detailed Engineering and Construction Supervision
Ministry of Defense (2006)
0514 Istanbul Haramidere Fuel Terminal
Tank Farm and Manifold Stations Renewal Detailed Engineering
Petrol Ofisi Inc. (2005)
0513 Khurmala Oil Field Development - IRAQ
230 km Pipeline and Block Valve Stations Detailed Engineering
Avrasya Construction Inc. (2005 - 2006)
0507 Konya Main Airforce Base Aircraft Parking Apron Fuel Hydrant System
JP-8 Fuel Hydrant Refueling System Detailed Engineering
Ministry of Defense (2005)
0506 Izmit Derince Mineral Oil Factory
Tank Farm and Product Facilities Renewal Detailed Engineering
Petrol Ofisi Inc. (2005)
0505 Canakkale Kepez Fuel Terminal
Fuel Sea Terminal Detailed Engineering and Construction Supervision
Petrol Ofisi Inc. (2005)
0504 Istanbul Haramidere Fuel Terminal Bunker System
Preperation of Process and Instrument Diagrams for the Bunker System
Petrol Ofisi Inc. (2005)
0502 Baku - Tblisi - Ceyhan Crude Oil Pipeline IPT-2 Intermediate Pigging Station
IPT-2 Intermediate Pigging Station Construction Engineering
Fernas Ltd.Co. (2005)
0501 Istanbul Formula 1 Access Road Fuel Pipelines Variants
6 inch 130 m Pipeline (90 bar) Displacement, 85 m TEM Motorway Crossing with 10 inch Casing, 16 inch 122 m BOTAS Natural Gas Pipeline Displacement, 96 m TEM Motorway Crossing with 20 inch Casing and Cathodic Protection System Detailed Engineering
Kucukel Construction Ltd. (2005)
0420 Canakkale Kepez Fuel Terminal Bunker System
Preperation of Process and Instrument Diagrams for the Bunker System
Petrol Ofisi Inc. (2004)
0418 Izmit Mercedes Benz Factory Fuel Pipeline Variant
6 inch 322 m Pipeline (90 bar) Variant Inside Factory Area, 178 m Paved Area Crossing with 10 inch Casing, Hydrostatic Test and Cathodic Protection System Detailed Engineering and Construction Supervision
Mercedes Benz Turk Inc. (2004 - 2005)
0417 Trabzon Fuel Terminal Restoration
Tank Farm and Manifold Stations Renewal Detailed Engineering
Petrol Ofisi Inc. (2004 - 2005)
0409 Mersin Fuel Pier Restoration
Renewal of Fuel, Fire Water Pipelines, Pipe Racks and Cathodic Protection System of the Existing Fuel Pier Detailed Engineering and Construction Supervision
Ministry of Defense (2004 - 2006)
0408 ErzurumTank Farm - Ilica Fuel Pipeline
6 inch, 2.5 km Pipeline and Additional Facilities Detailed Engineering and Construction Supervision
Ministry of Defense (2004 - 2006)
0406 Konya Main Airforce Base FOB Facilities Jet Fuel Storage Tanks
Restoration of 3 each 1000 cum Storage Tank and Epoxy Coating, Level Measurement Systems, 2 each Oil/Fuel Seperator System and 1,750 m Wire Fence Detailed Engineering and Construction Supervision
Ministry of Defense (2004 - 2006)
0316 Baku - Tblisi - Ceyhan (BTC) Crude Oil Pipeline Sivas - Ceyhan Section (Lot-C)
330 km, 34 and 42 inch Crude Oil Pipeline Construction Engineering
Punj Lloyd - Limak (PLL) Joint Venture (2003 - 2005)
0315 Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Horasan - Sivas Section (Lot-B)
465 km, 42 inch Crude Oil Pipeline Construction Engineering
Streicher - Timmerman - Gunsayil - Alarko (STA) Joint Venture (2004 - 2005)
0302 2001 Fuel Pipelines Washout Damages
For 4,6,8 and 10 inch Pipelines (90 bar), 654 m River Crossing, 3700 m Variant Construction, 160 m Railway and Road Crossing, 113 m Gabion Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (2003 - 2005)
0301 Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Pump Stations
Construction Engineering for 4 Main 1 Intermediate Pump Station
CBI John Brown Limited (2003 - 2004)
0202 Tersakan River Fuel Pipeline Variant and Various POL Facilities Restoration
For 6 inch Pipeline (90 bar) 80 m Variant Construction, at 6 Tank Farm Concrete Pavement and Internal Road Construction Detailed Engineering and Construction Supervision
Ministry of Defense (2002 - 2004)
0106 Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Crossings Survey
River, Highway and Railway Crossings Survey on the 1,070 km Crude Oil Pipeline Route
Botas Inc. BTC Directorate (2001)
0101 Golcuk Naval Base Fuel Pier
150 m Fuel Pier and Land Facilities Detailed Engineering and Construction Supervision
Ministry of Defense (2001 - 2007)
0007 Konya Main Airforce Base FOB Facilities Jet Fuel Loading System
Refueling Truck Loading/Unloading Facilities Detailed Engineering and Construction Supervision
Ministry of Defense (2000 - 2002)
0004 Restoration of Fuel Facilities at East Turkey
Restoration of Fuel Facilities at Eastern Anatolia Detailed Engineering and Construction Supervision
Ministry of Defense (2000 - 2002)
0003 Restoration of Fuel Facilities at West Turkey
Restoration of Fuel Facilities at Western Anatolia Detailed Engineering and Construction Supervision
Ministry of Defense (2000 - 2002)
0002 1999 East and West Anatolia Fuel Pipeline Variants
For 4,6 and 8 inch Pipelines (90 bar), 2990 m Variant Construction, 397 m River Crossing, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (2000 - 2002)
9917 Renewal of Pumps on Iskenderun - Malatya Pipeline
Renewal of Pump Groups at 5 Pump Stations Detailed Engineering and Construction Supervision
Ministry of Defense (1999 - 2001)
9908 Restoration of Fuel Storage Tanks at Izmir Uzunada Naval Base
Restoration of 2 each 8,350 cum Fuel Storage Tank Detailed Engineering and Construction Supervision
Ministry of Defense (1999 - 2000)
9907 Adana, Osmaniye and Erzurum Fuel Pipeline Variants
For 6,8 and 10 inch Pipelines (90 bar), 870 m Variant Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1999 - 2000)
9901 Osmaniye Pump Station Restoration
Renewal of Pump Groups at Osmaniye Pump Station Detailed Engineering and Construction Supervision
Ministry of Defense (1999 - 2001)
9816 1998 Fuel Facilities Restoration
For 4,6 and 8 inch Pipelines (90 bar), 2610 m Variant Construction, Hydrostatic Tests, Cathodic Protection Systems and Various Restoration Works at 13 Tank Farm and Pump Station Detailed Engineering and Construction Supervision
Ministry of Defense (1998 - 2001)
9815 Denizli Cardak Rail Car Towing System and Osmaniye Manifold Station Restoration
Rail Car Towing System at Denizli Cardak Rail Unloading Point, 6 inch 70 m Pipeline, Cathodic Protection System and Osmaniye Low Pressure Manifold Station Detailed Engineering and Construction Supervision
Ministry of Defense (1998 - 2000)
9814 Istanbul Alibeykoy and Izmit Tank Farms Restoration
Storm Water Drainage System at Alibeykoy Tank Farm, 1716 m Internal Road at Izmit Tank Farm Detailed Engineering and Construction Supervision
Ministry of Defense (1992 - 1993)
9810 Izmit - Eskisehir Pipeline Pump Stations Restoration
Renewal of Pump Groups at 3 Pump Stations Detailed Engineering and Construction Supervision
Ministry of Defense (1998 - 2001)
9808 1997 East Turkey Fuel Facilities Restoration
Restoration of Pump Stations at North Iskenderun, Elazig, Adana, Mersin Tank Farms and Gezin Pump Station Detailed Engineering and Construction Supervision
Ministry of Defense (1998 - 2000)
9805 Bursa, Karacabey and Sogut Fuel Pipeline Variants
For 4 and 6 inch Pipelines (90 bar), 245 m Road Crossing, 1610 m Variant Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1998 - 2000)
9801 Esenyurt, Sazlidere, Yenicekoy and Erzin Pipeline Variants
For 4,6 and 8 inch Pipelines (90 bar), 120 m Road Crossing, 970 m Variant Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1998 - 1999)
9721 Kemah, Sivas, Diyarbakır and Batman Pipeline Variants
For 4 and 8 inch Pipelines (90 bar), 100 m Road Crossing, 1875 m Variant Construction, 225 m Concrete Encasement, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1997 - 1999)
9712 1996 Various Fuel Facilities Restoration
For 4,6 and 8 inch Pipelines (90 bar), 2000 m Variant Construction, Hydrostatic Tests, Cathodic Protection Systems and Various Restoration Works at 11 Tank Farm Detailed Engineering and Construction Supervision
Ministry of Defense (1997 - 1999)
9709 Istanbul Alibeykoy and Bursa Mudanya Fuel Pipeline Variants
For 4 and 6 inch Pipelines (90 bar), 225 m Variant Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1997 - 1999)
9708 Sivas Divrigi Mursal Fuel Pipeline Variant
For 6 inch Fuel Pipeline (90 bar), 2319 m Variant Construction, Hydrostatic Test and Cathodic Protection System Detailed Engineering and Construction Supervision
Ministry of Defense (1997 - 1998)
9707 1996 West Anatolia Turkey Fuel Pipeline Variants
For 4,6 and 8 inch Pipelines (90 bar), 890 m Variant Construction, 75 m Gabion Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1997 - 1998)
9702 1996 East Turkey Fuel Pipeline Variants
For 6 and 8 inch Pipelines (90 bar), 340 m River Crossing, 555 m Variant Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1997 - 1999)
9701 Iskenderun Sariseki Fuel Pipeline Variants
For 3 each 8 inch and 1 each 24 inch Pipeline (90 bar), 5940 m Variant Construction, 40 m Road Crossing with Casing, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1997 - 1998)
9601 1995 East Turkey Fuel Pipeline Variants
For 4,6 and 8 inch Pipelines (90 bar), 220 m River Crossing, 390 m Variant Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1996)
9508 Kirikkale Fuel Storage Facilities
Environmental Impact Assessment for 2 each 2000 cum, 4 each 1000 cum Fuel Storage Tank, Pump Station and 4 km Pipeline
Turkuaz Oil Products Inc. (1995)
9504 1994 East Turkey Fuel Pipeline Variants
For 4,6 and 8 inch Pipelines (90 bar), 155 m River Crossing, 1300 m Variant Construction, 20 m Gabion Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1995 - 1996)
9503 1995 Fuel Facilities Restoration
Various Restoration Works at Eskisehir and Erzurum Pump Stations Detailed Engineering and Construction Supervision
Ministry of Defense (1995 - 1996)
9502 Iskenderun - Elazig Fuel Pipelines Route Study
316 km 8 inch Iskenderun-Malatya and 127 km 6 inch Malatya-Elazig Fuel Pipelines Route Study Detailed Engineering
Ministry of Defense (1995 - 1996)
9304 1992 East Turkey Fuel Pipeline Variants
For 4,6,8 and 10 inch Pipelines (90 bar), 1085 m River Crossing, 3420 m Variant Construction, 395 m Gabion Construction, 210 m Retaining Wall Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1993 - 1995)
9207 Elazig - Batman Pipeline Pump Stations Restoration
Renewal of Pump Groups at Elazig - Batman Pipeline Pump Stations Detailed Engineering
Ministry of Defense (1992)
9206 Merzifon Main Airforce Base Jet Fuel Storage Facilities
Jet Fuel Storage Facilities Basic Engineering
Ministry of Defense (1992)
9203 1991 East and West Turkey Fuel Pipeline Variants
For 4,6 and 8 inch Pipelines (90 bar), 550 m River Crossing, 4555 m Variant Construction, 270 m Gabion Construction, Hydrostatic Tests and Cathodic Protection Systems Detailed Engineering and Construction Supervision
Ministry of Defense (1992 - 1994)
9101 Afyon Airfield Main Operation Facilities
Jet Fuel Storage Facilities Detailed Engineering and Construction Supervision
Ministry of Defense (1991 - 1994)
9007 Batman, Bismil, Diyarbakir Pump Stations Renewal of Pump Groups
Renewal of 8 each Main Line Pump Group at 3 Pump Station Basic Engineering
Ministry of Defense (1992)
9003 1990 Fuel Facilities Restoration
Restoration of 7 each 1,250 cum Fuel Storage Tandk at 7 Tank Farm, Concrete Pavement Construction at 4 Pump Station Detailed Engineering and Construction Supervision
Ministry of Defense (1990 - 1992)
8905 Iskenderun Fuel Operations Center
Fuel Operations Center Basic Engineering
Ministry of Defense (1989 - 1990)
8902 Akhisar Airfield F-16 Facilities
Jet Fuel Storage and Dispensing Facility Basic Engineering
Ministry of Defense (1989)
8704 Slice 38 Various Fuel Facilities
Pump Stations, Manifold and Valve Pits Detailed Engineering and Construction Supervision
Ministry of Defense (1987 - 1989)
8606 Ipras - Haramidere Fuel Pipeline
128 km, 16 inch, Fuel Pipeline Construction Supervision and Ipras Pump Station Detailed Engineering and Construction Supervision
Ministry of Transportation DLH General Directorate (1986 - 1988)
8605 Corlu Airfield Jet Fuel Storage Facilities
Jet Fuel Storage and Hydrant Refueling System Detailed Engineering and Construction Supervision
Ministry of Defense (1986 - 1989)
8502 Dalaman Airfield Jet Fuel Storage Facilities
Jet Fuel Storage Facilities Detailed Engineering and Construction Supervision
Ministry of Defense (1984 - 1987)
8102 Restoration of Jet Fuel Facilies at Bandırma Main Airforce Base
Restoration of Jet Fuel Storage Tanks and Manifold System Detailed Engineering and Construction Supervision
Ministry of Defense (1981 - 1985)
8003 Iskenderun Fuel Facilities Restoration
Restoration of Fuel Tanks Detailed Engineering and Construction Supervision
Ministry of Defense (1980 - 1984)
8002 Konya Main Airforce Base Jet Fuel Storage Facilities
Jet Fuel Storage Tanks, Manifold, Piping and Truck Loading Station Detailed Engineering and Construction Supervision
Ministry of Defense (1980 - 1984)
7602 Istanbul Ataturk Airport Jet Fuel Hydrant Facilities
Jet Fuel Hydrant System and Facilities Detailed Engineering
Ministry of Transportation DLH General Directorate (1976 - 1977)
1202 TaqTaq Oil Field TT16,17,18 Crude Oil Flow Lines – IRAQ
7 km Crude Oil Flow Lines Detailed Engineering
Havatek Inc. (2011)
1101 TaqTaq Oil Field TT12,13,14,15 Crude Oil Flow Lines - IRAQ
11.5 km Crude Oil Flow Lines Detailed Engineering
Havatek Inc. (2011)