Energy Production and Others
Project No 0102
Project Title Konya Main Airforce Base AWACS Parking Apron Frequency Converters
Client Ministry of Defense
Start - Finish 2001 - 2003
Alone or Joint-Venture Alone
Detailed Description
Provision and Installation of 3 each Frequency Converter at Aircraft Parking Apron for Power Supply to AWACS Aircrafts

3 x 312.5 kVA , 230/400 V, 50 Hz - 120/208 V, 400 Hz Frequency Converter
1 kV, 3x240/120 sqmm, 1,400 m, LV Cable
5.8/10 kV, 3x70/16 sqmm, 2,500 m, MV Cable
1 each 33/6.3 kV , 7,500 kVA Transformer
Modifications in Existing Commercial Power Substation and Power Plant
48 sqm Concrete Transformer Building (6.3/0.4 kV, 1,000 kVA)
MV and LV Switchgear Systems
375 kVAR Power Factor Correction System
Lighting, Grounding and Lightning Protection Systems
Services Provided By ESER
Detailed Engineering
Cost Estimations
Tender Evaluation
Tender Documentation
Construction Supervision
Construction Specifications
Commissioning
Start-up Inspections
Basic Engineering
Topographical Surveys
You may click on images to view in large format.