Oil Storage and Distribution
Project No 0408
Project Title ErzurumTank Farm - Ilica Fuel Pipeline
Client Ministry of Defense
Start - Finish 2004 - 2006
Alone or Joint-Venture Alone
Detailed Description
Erzurum Tank Farm - Ilica Rail Loading Station Pipeline

2,500 m, PN 100, DN 150 New Pipeline Construction
2 each Highway Crossing (114 m)
River Crossing (54 m)
Hydrostatic Tests
Cathodic Protection with Transformer/Rectifier System

At 8 Different Pump Station and Tank Farm in East Anatolia

15 each Truck Unloading Pit
4 each Unloading Pump Station
11 each Truck Loading Point
4 each Existing Manifold Station
4 each Drainage Tank
1 each Valve Pit
1 each Standby Diesel-Generator Building (235 kVA, 0.4 kV)
34.5 kV, 160 kVA Power Supply
Hydrostatic Tests
Cathodic Protection System
Services Provided By ESER
Detailed Engineering
Cost Estimations
Tender Evaluation
Tender Documentation
Construction Supervision
Construction Specifications
Commissioning
Start-up Inspections
Basic Engineering
Topographical Surveys