Gas Distribution and Metering
Project No 0305
Project Title Adapazari Natural Gas Distribution System - Phase 3
Client Agdas Adapazari Gas Distribution Inc.
Start - Finish 2003 - 2004
Alone or Joint-Venture Alone
Detailed Description
Adapazari and Surrounding Municipalities
Natural Gas Distribution System Phase - 3


17,5 km, 4-20 inch Diameter PE Coated Steel Pipe
100 km, 20-125 mm Diameter Polyethylene Pipe
10 each District Regulator
Natural Gas Main Line System Schematics
Highway, Railway and River Crossings
Pipeline Plan and Profiles
Cathodic Protection Systems
Control and Instrumentation
Valve Rooms Schematic Diagrams
Hydraulic Analysis of Natural Gas Network
As-Built Documentation
Services Provided By ESER
Detailed Engineering
Cost Estimations
Construction Shop Drawings
Construction Specifications
Commissioning
Topographical Surveys