Railways and Light Rail Systems
Project No 0306
Project Title Bursa Ayazma - Inonu High Speed Railway (Demirtas)
Client Demirtas Organized Industrial Zone Directorate
Start - Finish 2003 - 2003
Alone or Joint-Venture Alone
Detailed Description
Bandirma - Bursa - Ayazma - Osmaneli High Speed Railway
Ayazma - Inonu Section (94+000 - 105+500)
Demirtas Organized Industrial Zone Area


11.5 km Double Lane High Speed Train Railway

Project Speed : 200 km/hr
Catenery : Electrical
Maximum Slope : % 0.125
Minimum Curb Radius : 3,000 m
1/25,000 and 1/2,000 Scale 600 m Wide Topographical Survey
1/2,000 Scale 11.5 km High Speed Railway Route Plan and Profiles
Total 36.4 Hectare Land Acquisition and Expropriation

Soil Investigations
Total 250 m Soil Boring (10-25 m)
Seismic Tests
Resistivity Tests
Laboratory, Pressiometer, Piessiometer Tests
Geological Map, 1/2,000 Geological Plan and Profile

Structures
Viaduct : 2 each, 225 m, 25 m Foot Interval, Prestressed Precast
Box Culvert : 19 each
Bridge : 8 each
Underpass : 13 each

1 each Organized Industry Station
Services Provided By ESER
Detailed Engineering
Cost Estimations
Tender Documentation
Construction Specifications
Geophysical Studies
Geotechnical Studies
Basic Engineering
Topographical Surveys