Oil Storage and Distribution
Project No 0502
Project Title Baku - Tblisi - Ceyhan Crude Oil Pipeline IPT-2 Intermediate Pigging Station
Client Fernas Ltd. Co.
Start - Finish 2005 - 2005
Alone or Joint-Venture Alone
Detailed Description
Construction Engineering for the Following Facilities

Transformer Building
Operation and Utility Building
Accommodation & Guard Building
Foundations for Wax Handling Skids, Heating Container and Poles
Bypass Valve Shelters, Covers for Shafts
Steel Structures as Stairs, Platform and Ladders
Diesel, Slope, Water Tanks and Oily Water Separator
Lines, Valves and Pumps
Stormwater, Sewage and Waste Water Systems
34.5 kV Overhead Line, Power Transformer
MV and LV Switchgear Systems
UPS and DC Systems
Field Lighting, Grounding, Fire Alarm and Lightning Protection Systems
Electrical Trace Heating
Electrical Installations for Buildings
SCADA, Instrumentation and Telecommunication Systems
HVAC Systems
Field Engineering
Geotechnical Engineering
As-Built Documentation
Services Provided By ESER
As-Built Documentation
Construction Shop Drawings
Construction Supervision
Construction Engineering Support Services