Oil Storage and Distribution
Project No 0513
Project Title Khurmala Oil Field Development - IRAQ
Client Avrasya Construction Inc.
Start - Finish 2005 - 2006
Alone or Joint-Venture Alone
Detailed Description
Underground Crude Oil Pipelines
14 inch 1.2 km, 16 inch 17. 5 km, 20 inch 55 km
Underground Gas Pipelines
20 inch 68.6 km, 24 inch 32 km
Aboveground Crude Oil Pipelines Between Individual Wells and Stations (6 inch 55 km)
Below Ground Water Pipelines 4,6,8 inch
2 each Crude Oil Pipeline Block Valve Station
2 each Gas Pipeline Block Valve Station
2 each Temporary Water Pigging Station
Finalization of Alignment Sheets
Design of Crude Oil and Gas Pipeline Block Valve Stations
Layout, Plan, Section, Isometrics, Civil Details
Hazardous Area Classification
Access Roads
Design of Temporary Water Line Pigging Stations (Layout, Plan, Isometrics)
Typical Special Crossing Design
Services Provided By ESER
Detailed Engineering
Cost Estimations
Construction Shop Drawings
Construction Specifications
Procurement Documentation