Motorways and State Highways
Project No 0625
Project Title Erzurum - Tortum - Uzundere State Highway
Client General Directorate of State Highways
Start - Finish 2006 - 2009
Alone or Joint-Venture Alone
Detailed Description
Erzurum - Tortum - Uzundere 10.Dist. Border State Highway

Total Length : 31 km
Project Speed : 90 km/h
2 lanes each 3.50 m
Platform Width : 12 m
Box Culvert : 74 each
Retaining Wall : 250 m
Junction : 9 each
Services Provided By ESER
Detailed Engineering
Cost Estimations
Geophysical Studies
Geotechnical Studies
Topographical Surveys