Buildings and Special Structures
Project No 0802
Project Title Ankara Esenboga Airport Aircraft Maintenance Hangar
Client Turkish Airlines Technic Inc.
Start - Finish 2008 - 2009
Alone or Joint-Venture Alone
Detailed Description
Total Construction Area : 10,840 sqm

Aircraft Maintenance Hangar :

Reinforced Concrete, Steel Roof, 24 m Height (5,641 sqm)

Administration Building Adjacent to Hangar :
Reinforced Concrete (1,300 sqm)

Ground Floor :
Administrative Sections, Rest Rooms, WC & Showers, Warehouse and Workshops,
Electrical and UPS Room, Filter Washing Room, Security, Heating Room

First Floor :
Mechanical Section

Fire Extinguishing System Water Tank (1,000 cum) and Foam Tanks
Transformer and Generator Building (160 sqm)

Mechanical Systems :

Cooling System :
At Fan-Coil and Air Handling Zones, Air-Cooled Chiller Unit,
89 kW Total Cooling Capacity, 12 Fan-Coil Ünits
Heating System :
At Five Different Zones, Three Boiler (Each 1,000 kW) 3,000 kW Total Heating Capacity
HVAC System :
1 Air Handling Unit (9,100 cum/h) and 3 Ventilation Unit (Total 59,600 cum/h)
47 each Unit Heater, 9 each Exhaust Fan
All HVAC System Managed by Building Automation System
Fire Protection System Completely Based on NFPA Regulations
Fire Extinguishing System with Wet Type Sprinklers
Smoke Sensitive Ventilation System at Hangar

Electrical Systems :

34.5 kV, 900 m MV Underground Power Cable
34.5/0.4 kV, 1,250 kVA Dry Type Power Transformer
1,250 kVA Automatic Diesel Generator
20 kVA UPS System
MV and LV Switchgear Systems
Fire Detection and Alarm Systems
Grounding and Lightning Protection Systems
Telephone and Data Systems
Automation System
Security and CCTV (Closed Circuit TV) Systems
Access Control System
Services Provided By ESER
Detailed Engineering
Cost Estimations
Tender Documentation
Construction Supervision
Construction Specifications
Commissioning
Start-up Inspections
Geophysical Studies
Geotechnical Studies
Basic Engineering
Topographical Surveys