Railways and Light Rail Systems
Project No 0603
Project Title Istanbul Sefakoy - Istoc Metro Line
Client Istanbul Metropolitan Municipality
Start - Finish 2006 - 2010
Alone or Joint-Venture Alone
Detailed Description
Installation of a metro line to be operated integratedly at Ataturk Airport Station with the Aksaray-Ataturk Airport subway line, which is currently in service; at Ikitelli Guney Sanayi Station with the Otogar-Kirazli-Ikitelli-Basak Konutları/Olimpiyat Parki subway line, which is under construction; at Cobancesme Station with the Bakirkoy-Beylikduzu subway line as planned to be constructed.

First investment period: 2012 - 2015

Target year (Landscape Plan Target Year): 2023

Feasibility evaluation period: 2012 - 2040

Total length of 11.600 meter, all underground

9.179 meter of TBM boring double tunnel, 48 m of open-close tunnel

Total 12 underground stations of total 2.101 m long, including 4 stations of 540 m to be constructed by the open-close method and 7 stations of 1.561 m to be constructed by the method NATM (New Austrian Tunneling Method)

Due to transportation easiness, there are nationally and locally important industrial, manufacturing and wholesale trade areas ((Ikitelli Organized Industrial Zone, ISTOC, etc) and also nationally and locally important sports facilities (Ataturk Olympic Park and Stadium)
Services Provided By ESER
Detailed Engineering
Geophysical Studies
Geotechnical Studies
Basic Engineering
Topographical Surveys