Oil Storage and Distribution
Project No 8606
Project Title Ipras - Haramidere Fuel Pipeline
Client Ministry of Transportation
General Directorate of Railways, Harbours and Airports Construction
Start - Finish 1986 - 1988
Alone or Joint-Venture Alone
Detailed Description
Islamic Development Bank Financed Pipeline and Pump Station

16 inch Product Pipeline Construction Supervision

128 km, 16 inch, 100 kg/cm2, API 5L X52 Steel Pipeline
Laying of High Pressure Fuel Pipes
Cathodic Protection
620 m Concrete Encased River Crossing
380 m River Crossing
Scraper Station Construction at 5 Locations

Ipras Pump Station Detailed Engineering and Construction Supervision

High Pressure Pump Station with 3 each 340 cum/h, 760 mLC Parallel Pump-Motor Group
Services Provided By ESER
Detailed Engineering
Cost Estimations
Tender Evaluation
Tender Documentation
Construction Supervision
Construction Specifications
Commissioning
Topographical Surveys
You may click on images to view in large format.