Oil Storage and Distribution
Project No 0713
Project Title Derince Fuel Terminal Manifold Rehabilitation
Client Petrol Ofisi Inc.
Start - Finish 2007 - 2007
Alone or Joint-Venture Alone
Detailed Description
White Product Pump/Manifold Station Renewal
(Steel Construction 1,500 sqm)


Control and Otomation Building (Concrete, 260 sqm )
Truck Loading System
Power Supply System (1600 kVA Transformer, 500 kVA Generator)
LV Switchgear and Distribution Systems
Field Lighting and Grounding Systems
Instrumentation and Control Systems
Loading, Blending and National Marker Systems Otomation
White Product Pipelines and Valves (1 inch - 14 inch, 16,900 m)
24 each White Product Pump (120 cum/h, 740 cum/h)
Steel Piperacks and Supports
Stormwater Drainage System
Oily Water Drainage System
Concrete Pavements, Pipe Channels and Dikes
Services Provided By ESER
Detailed Engineering
Cost Estimations
Tender Documentation
Construction Specifications
Procurement Documentation
Topographical Surveys