Railways and Light Rail Systems
Project No 8302
Project Title Komurler - Osmaniye High Speed Railway
Client Ministry of Transportation DLH General Directorate
Start - Finish 1983 - 1988
Alone or Joint-Venture Alone
Detailed Description
78 km. Double Lane High Speed Railway
Maximum Slope : % 012.5
Minimum Curb Radius : 1,000 m
1/25,000 Scale Topographic Survey
1/2,000 Scale, 600 m Wide Topographic Survey
Application and Crossections

Soil Investigations
Total 10,000 m Soil Boring
Seismic and Resistivity Tests
Laboratory Tests
Pressiometer Tests
Piessiometer Tests

Tunnels (4.8 m Dia., 40 cm Concrete Thickness)
Ayran Tunnel : 10,276 m
Ayran Tunnel Access Tunnel : 1,800 m,
Kokarpinar-Tasoluk Tunnels : 647 m+640 m+1154 m+603 m

Structures
Viaduct : 5 each, 25 m Foot Interval, Prestressed Precast
Arch : 88 each
Box Culverts : 60 each
Overpass : 12 each
Underpass : 12 each

4 each Station Facilities
Station Building
Platforms
Pedestrian Underpasses
Warehouse
Open Storage
Tool Shed
100 Ton Wagon Cantar
Heating Center
Personnel and Guest Lodgings
Transformer Building
Services Provided By ESER
Environmental Impact Study
Detailed Engineering
Economic and Financial Analysis
Cost Estimations
Feasibility Study
Tender Documentation
Geophysical Studies
Geotechnical Studies
Conceptual Enginering
Basic Engineering
Topographical Surveys
Transportation Study