Railways and Light Rail Systems
Project No 1106
Project Title Kemalpasa - Torbali and Alsancak Harbour Connection Railway
Client Ministry of Transportation DLH General Directorate
Start - Finish 2011 - 2012
Alone or Joint-Venture Alone
Detailed Description
70 km Double Lane Railway
Maximum Slope : % 0.17, Minimum Curb Radius : 500 m
1/25,000 and 1/2,000Scale 600 m Wide Topographical Survey
1/2,000 Scale 70 km Railway Route Plan and Profiles

Electrification Systems
25 kV Catenery Line
25 kV Transformer Centers
Section Post Buildings

Signalisation and Communication Systems
Remote Control (SCADA) and Monitoring Systems
Automatic Train Stopping, Energy Transfer and Telephone Systems

Soil Investigations
Total 2,500 m Soil Boring (10-250 m)
Laboratory, Pressiometer and Piessiometer Tests
Geological Map, 1/2,000 Geological Plan and Profile

Open-Cut and NATM Bored Tunnels (84 sqm Crossection Area)
Total 9 each 22,670 m Tunnel, Longest Tunnel Length : 6,350 m

TBM Bored Tunnels (Twin Tube, 7 m Diameter)
Total 1 each 5,025 m

Structures
5 each Box Culvert, 21 each Overpass and Underpass Bridge, 2 each Bridge

3 each Underground Station Facilitiy at Otogar-Halkapınar Section
Services Provided By ESER
Environmental Impact Study
Detailed Engineering
Economic and Financial Analysis
Cost Estimations
Feasibility Study
Tender Documentation
Construction Specifications
Geophysical Studies
Geotechnical Studies
Topographical Surveys