Gas Distribution and Metering
Project No 9806
Project Title Kirklareli Malkoclar Natural Gas Pressure Reducing and Metering Station
Client Emas - Harmak Joint Venture
Start - Finish 1998 - 2000
Alone or Joint-Venture Alone
Detailed Description
Increasing the Capacaity of the Existing Malkoclar Natural Gas Pressure Reducing and Metering Station to 14 BCM/Year

Filter and Metering Skid
Pressure Reducing Skid
3 each Filter
2 each Gas Chromotograph
2 each Receiving Scraper Trap
1 each Launching Scraper Trap
Slug Catcher
Control and Instrumentation Systems
2 x 40 inch, 2,616 m Pipeline Construction Between Bulgarian Border and the Station
Services Provided By ESER
Detailed Engineering
Construction Shop Drawings
Construction Specifications
Operating and Maintenance Instructions
Commissioning
Start-up Inspections
Procurement Documentation
You may click on images to view in large format.