Railways and Light Rail Systems
Project No 9713
Project Title Isparta Light Rail System
Client Ministry of Transportation DLH General Directorate
Start - Finish 1997 - 1998
Alone or Joint-Venture Alone
Detailed Description
Urban Transportation Study
Light Rail System Engineering Design
Economical and Financial Feasibility Study


12 km, 8.000 Passenger/hour/one way, 22 Stations
35 km/h (in city), 70 km/h (other routes)
33 Cars at year 2017

Sleeping Area

Parking Area for 9 Cars
Office Building

Depot Area (50.000 sqm)

Daily Maintenance Shop
Car Washing Facility
Car Depot Area
Heavy Maintenance Shop
Control and Administration Building

7 each 34.5 KV Transformer/Rectifier Station (Each having 2x2000 KVA Rectifier)
750 VDC Catanery System
Signalisation and Communication Systems
SCADA System
Toll Collection System
Services Provided By ESER
Detailed Engineering
Economic and Financial Analysis
Cost Estimations
Feasibility Study
Tender Documentation
Construction Specifications
Geophysical Studies
Geotechnical Studies
Cost Control & Time Scheduling
Topographical Surveys
Transportation Study
You may click on images to view in large format.