Motorways and State Highways
Project No 0011
Project Title Carsibasi - Arakli State Highway
Client General Directorate of State Highways
Start - Finish 2000 - 2005
Alone or Joint-Venture Alone
Detailed Description
Carsibasi - Arakli Seperated State Highway (Km:14+000-82+000)
Total Length : 68 km
Project Speed : 90 km/hr
4 Lanes Each 3.50 m
Platform Width : 24 m
Box Culvert : 94 each
Retaining Wall : 3000 m
Junction : 12 each
Services Provided By ESER
Detailed Engineering
Cost Estimations
Geophysical Studies
Geotechnical Studies
Topographical Surveys
You may click on images to view in large format.