Water Supply and Wastewater
Project No 9704
Project Title Adapazari Cark Creek Rehabilitation
Client Metis Construction Inc.
Start - Finish 1997
Alone or Joint-Venture Alone
Detailed Description
Main Collector Line, 8 km Long and 2.4 m Diameter and Manholes
Construction of 5 each 10 m Long Bridge on the Cark River
Rehabilitation of Cark River With Concrete Pavement and Rip-Raps
Construction of 5 mt Wide Pedestrian Walkways on Each Side of the Cark River
Services Provided By ESER
Detailed Engineering
Construction Specifications
Geotechnical Studies
Topographical Surveys
You may click on images to view in large format.