- Project No:
- Project Title:
- Energy and Other Facilities
- Client:
- Start - Finish:
- 1983 - 2005
- Venture Type:
- Alone
Detailed Description:
0404 - Konya Main Airforce Base Dehumidification Systems for AWACS Aircrafts
(Ministry of Defense, 2004-2005)
Provision and Installation of 3 each Munters Stationary Dehumidification Systems at AWACS Aircraft Parking Apron Detailed Engineering and Construction Supervision
0105 - Ankara Navy Headquarters Building Restoration of HVAC and Electrical Systems
(Ministry of Defense, 2001)
18,000 sqm Building HVAC and Electrical Systems Renewal Detailed Engineering
0102 - Konya Main Airforce Base AWACS Parking Apron Frequency Converters
(Ministry of Defense, 2001-2003)
Provision and Installation of 3 each Frequency Converter (3x312.5 kVA) at Aircraft Parking Apron for Power Supply to AWACS Aircrafts Detailed Engineering and Construction Supervision
0012 - Ankara Turkish General Staff Restoration of HVAC and Electrical Systems
(Ministry of Defense, 2000)
Total 45,000 sqm Buildings HVAC and Electrical Systems Renewal Detailed Engineering
9902 - Restoration of Various Air Radar Bases
(Ministry of Defense, 1999-2001)
Renewal of UPS and HVAC Systems at Erzurum, Kastamonu, Van, Antalya ve Rize Air Radar Bases Detailed Engineering and Construction Supervision
9807 - Erzurum Kargapazarı MV Overhead Line
(Ministry of Defense, 1998-1999)
27 km, 34.5 kV, 168 each Steel Pole, Pigeon 3/0 and Patrigge (266.800) Conductors Overhead Transmission Line and 13.5 km 1x50s/16 sqmm XLPE Underground Cable and Trench Detailed Engineering and Construction Supervision
9804 - Konya Main Airforce Base Electrical System Restoration
(Ministry of Defense, 1998-1999)
11,500 m 6.3 KV Underground Cable, 5 each 100-315 KVA Transformer and MV/LV Switchgears Detailed Engineering and Construction Supervision
9514 - Air Radar Bases UPS and Generator Systems
(Ministry of Defense, 1995)
160 KVA UPS and 200 KVA Automatic Generator Systems at Erzurum and Mardin Air Radar Bases Detailed Engineering
9401 - Power Supply to Gölcük Naval Base Submarine Piers
(Ministry of Defense, 1994)
For 1400 ton Submarines 70 sqm Converter Building, 100 KVA 115 V 60 Hz Frequency Converter and Pier Cable Connections Basic Engineering
8303 - Bartin, Pazar, Persembe and Mardin Air Radar Bases Restoration
(Ministry of Defense, 1983-1984)
Renewal of HVAC Systems at Bartin, Pazar, Persembe and Mardin Air Radar Bases (2 each 120,000 Kcal/h Cooling Unit at each Radar Base) Detailed Engineering and Construction Supervision
Services Provided By ESER
Detailed Engineering
Cost Estimations
Tender Documentation
Environmental Impact Study
Geophysical Studies
Geotechnical Studies
Basic Engineering
Topographical Surveys