Buildings and Special Structures
Project No 0016
Project Title Izmir Naval Shipyard New Facilities
Client Ministry of Defense
Start - Finish 2000 - 2001
Alone or Joint-Venture Alone
Detailed Description
Fire Station and Trideck Commandership Building :

Total Construction Area 591 sqm
36 each Pile with 30 m Length
Heating Ventilating and Air Conditioning System
Two Different Power Supply System
Addressable Fire Alarm System

320-330 Chief Engineers Building :

Total Construction Area 612 sqm
42 each Pile with 30 m Length
Heating Ventilating and Air Conditioning System
Two Different Power Supply System
Addressable Fire Alarm System

400 Directorate Building :

Total Construction Area 656 sqm
38 each Pile with 30 m Length
Heating Ventilating and Air Conditioning System
Two Different Power Supply System
Addressable Fire Alarm System

400 Directorate Car Sheds :
945 sqm Steel Construction Car Sheds
88 sqm Engine Repair Workshop

General Services and Rigger Workshop Building :
Total Construction Area 460 sqm
34 each Pile with 30 m Length
Heating Ventilating and Air Conditioning System
Two Different Power Supply System
Addressable Fire Alarm System

Oxygen and Acetylene Facility :

Total construction area 272 sqm
Ex proof Lighting, Power, Ventilating and Fire Alarm Systems
Automatic Fire Extunguishing System (Deluge Sprinkler Type)
Services Provided By ESER
Detailed Engineering
Cost Estimations
Tender Documentation
Construction Specifications
Geophysical Studies
Geotechnical Studies
Basic Engineering
Topographical Surveys
You may click on images to view in large format.