Railways and Light Rail Systems
Project No 0308
Project Title Konya Light Rail System
Client Konya Metropolitan Municipality
Start - Finish 2003 - 2004
Alone or Joint-Venture Alone
Detailed Description
Light Rail System Basic Engineering Design
Economical and Financial Feasibility


Total 32 km, 50,000 Passengers/day at year 2020

New Kunduracilar-Saracoglu (Fetih Street) Line, 9.1 km
New Alaaddin-Peripheral Road Line, 4.6 km
Capacity Increase of Existing Alaaddin-Selcuk University Line, 18.7 km


2 each Sleeping Area
Daily Maintenance Workshop (2x450 sqm)
Crew Building (2x120 sqm)
Parking Area for cars
12 each new 31.5 KV/0.675 kV, 1,250 kVA Transformer/Rectifier Station
Each having 1,000 KW Rectifier
Capacity Increase of Existing 6 each 31.5 KV/0.525 kV, 1,100 kVA Transformers
750 VDC Catanery System
Signalisation System
Services Provided By ESER
Economic and Financial Analysis
Cost Estimations
Feasibility Study
Basic Engineering
Topographical Surveys
Transportation Study
You may click on images to view in large format.